Friday, April 8, 2016

COMPANY: Rewrite



In our rewrite about the Company, we decided to make a number of changes or order to provide more clarity about our products and also to try to preempt some of the objections we have heard throughout this entire process.

1)  Design & Development - we originally wanted to start with a small scale bench model and possibly even with a working prototype on an electric bicycle.  But, as we worked through the design process, we realized that such a model would not be able to be built at a low cost, nor would the efficiency of an electric bicycle be good enough to warrant such a prototype.  As such we scrapped than plan and retooled our development process to focus on grant funding in order to have the funding needed to produce a viable prototype.

2)  Technical Detail - we were advised that having too much technical detail in our Company section would bog down readers, so we more succinctly summarized the cost of our component parts and moved the technical detail into an appendix.

3) Safety - we have heard many people question the safety of using liquid nitrogen, so we worked to provide information that would give details on this issue.  For example, most people thing that liquid nitrogen is dangerous and/or explosive.  In fact, it is not at all explosive, and could actually retard a fire in the event of an accident.  It is, however, extremely cold, so there are some dangers associated with that, and we discussed our plans to mitigate these dangers.

1.1    Design & Development Plans

Phase I: Development of an alpha prototype
This will consist of an initial working benchtop prototype for proof of concept and instrumentation.  This is to bring the technology to the next level for investors and once demonstrated, reduce development risk. 
This early prototype will measure realized performances to determine electrical output, and to measure any efficiency losses in the system.  In particular, the efficiencies of the components and system as a whole.  The components of the system are standard engineering components (“off the shelf”), however, the efficiencies of each are empirical. This work will be conducted in borrowed workspaces.
The estimated time needed for development of this alpha prototype is approximately three months (500 hours) and will cost approximately $100,000.  We may be reliant on SBIR or other types of grant funding, so commencement of this work will be somewhat dependent on how long it takes to obtain this funding.  Estimated 3-6 months to obtain funding before work can commence, unless we are able to obtain equity investment first.
Phase II: Conversion of fundamental prototype into a demo
This stage will see a beta prototype built to be integrated into a passenger vehicle, tentatively, a Toyota Prius. Using an existing Toyota Prius or similar passenger vehicle, parts will be sourced and sized in order to equip the vehicle with a supplemental liquid nitrogen electrical power system.  Work will be conducted in a leased garage facility.
Extensive vehicle testing will be conducted to provide data on fuel efficiency, mileage, range, and emissions. Estimated time to source, build, and test the beta prototype will be approximately six months (1000 hours) and estimated costs are $250,000.
Phase III: Development of a market ready product
The beta prototype will be scaled up to a larger motor vehicle such as a tractor trailer, bus, or similar large vehicle.  This prototype will be built and parts sourced with larger volumes and redundant suppliers in order to facilitate a full market entry. A larger/additional garage space will be required in addition to a production facility.  Estimated time required is six months (2000 hours) and the estimated cost is $750,000 for initial testing, certification, and first product run. Estimated total development time is thirteen months (3700 man hours), plus time required to apply for and obtain grant funding, which for SBIR Phase I & II may require an additional twelve months or more.   The 3700 man hours will be divided amongst several employees, such that total development time will likely be 12-18 months.
The parts to create the end product are readily available in the open market “off the shelf”, with only final assembly and moderate modification required at the Company facility.  For detailed descriptions on the parts, please see the technical detail in the appendix section.  Costs for the core components include:
n Heat exchanger - $400 consumer, $800 industrial
n Low pressure turbine + generator - $2,000 consumer, $4,000 industrial
n Dewar (insulated storage tank) -  $1,800 consumer (20 gallon), $3,600 (40 gallon).
n Electrical components - $2,000 consumer, $4000, industrial
So the initial total cost to Cryogenic Power for the components totals $6,200 for a passenger vehicle, and about double that for larger vehicles, such as trucks and buses.   It should be noted that these costs are based on existing U.S. suppliers, and that through redesign, further sourcing, and volume ordering, that these costs will be driven down significantly over time.

1.2    Social Impact

Cryogenic Power will be dedicated to the causes of preserving clean air, improving energy efficiency, and continuing to develop renewable energy ideas that will benefit the economy and mankind.  The Company will measure impact on the reduction of fossil fuel use, the corresponding reduction of carbon emissions, and transportation cost savings to end users (both commercial and private).  These quantifiable measures will be a part of the Company’s “Balanced Scorecord”, which will measure results both in terms of financial performance and societal good as well.

1.3    Safety of Liquid Nitrogen

Liquid Nitrogen is a cryogenic fluid, meaning it is extremely cold.  It is not, however, flammable nor is it explosive.  In fact, it can act as a fire retardant in the event of an accident.  There are several potential dangers in dealing with liquid nitrogen, as there are with every type of fuel used for propulsion.  One is the pressure created as it expands (700X) from a liquid form to a gaseous form.  So storage tanks need to have a pressure relief valve in order to ensure that the pressure inside the storage tank remains within its structural limits.  Engineering of the tank can mitigate these risks.  Second is direct physical exposure to liquid nitrogen. It can cause burns to skin after four or five seconds of exposure, but this risk can also be offset by requiring locking nozzles on the fuel tank.  Finally, asphyxiation can be a danger, if LN2 is vented into an enclosed space.  An oxygen sensor can be used to mitigate this risk.

1.4    Product / Service Mix

This product / service mix outlines the proposed offering for CPI.  Ostensibly, it being with either licensing the product by the Original Equipment Manufacturer (OEM) or buying it in as an aftermarket unit.  
For example, in the passenger car market, Toyota could license CPI’s technology and put it in a Prius.  Similarly, a retail customer could purchase it and have it installed in the CPI shop or at a licensed installer. In a Prius, this would increase the mileage 2.6 times its OEM mileage, so if it got 50 MPG, it would now get 130 MPG.  
In the bus market, the Company would likely do more aftermarket installations.  Hybrid buses, which would be range bound by refueling locations would return to a central refueling station, where they would take on more fuel and LN2.  This would obviate the need for the creation of additional refueling stations.
Most of the locomotives are diesel electric and they can easily be adopted to this new technology.  It requires the separate attachment of a rail car that has both the LN2 and also a turbine/power system. 
Ancillary services for the company would include installation of the unit by CPI mechanics, fixing the unit when it goes down, and replacing parts on an occasional basis. 

Service
Passenger Vehicle Customer 30%
Bus / Truck  Customer
50%
Train Customer
20%
Sale of Unit
Aftermarket Unit for Hybrid vehicle
Aftermarket Unit for Hybrid vehicle
Aftermarket Unit for Diesel Electric Vehicle
Installation of Unit
Adapting / customizing customer   unit to a CPI standard unit for a specific customer 
Adapting / customizing customer   unit to a CPI standard unit for a specific customer
Adapting / customizing customer   unit to a CPI standard unit for a specific customer
Warranty
Repair / replace components
Repair / replace components
Repair / replace components
Licensing
For OEM car makers
For OEM car makers
For OEM car makers

1.5    Features vs. Benefits



Feature
Benefit
1.     LN2 is environmentally friendly
Vehicle manufacturers are increasingly having to meet stricter emissions standards. For example, a train gets .14 miles per gallon. This technology saves 263,736 gallons of diesel every year for each train. This results in 5,902,418 pounds of CO2 being dumped into the atmosphere every year.    
2.     Saves money on fuel
Using the train example above the operational cost savings in fuel for each train is $243,297 per year.
3.     Quickly refueled
The vehicle can be filled almost as fast as with conventional fuel.  For example, a Tesla takes ½ hour to get a charge lasting 100 miles. Who has time for that when you are on the road??
4.     Long lasting equipment
Turbines last about 25 years, the Dewar (tank) will last at least 10 years.  A Prius battery warranty lasts 150,000 miles.  This means the ROI on the complete unit (over 30 years for ships and locomotives, will be long lasting.
5.     Off the shelf parts
Many of the parts can be purchased of the shelf making it easy to assemble, scale up or down depending on the car.  This reduces the cost of the unit.
6.     Can be incorporated into any exhaust system
This system is incorporated and utilizes the exhaust system of any kind of vehicle. This means OEMs can design it into any vehicle system.
7.     Liquid Nitrogen is not combustible
In case of vehicle collision, it will not ignite.  In fact, it can help put out a fire.  It doesn’t need hazmat cleanup, it can vent directly into the atmosphere. This increases the safety of the system.
8.     LN2 can be used for other operations
You could conceivably plug the system into your house or other application when traditional power is not available.  In refrigerated trucks, it could be a substitute for a cooling system.
9.     LN2 Dewar has same storage capacity of lithium battery
This means that it can rival the capabilities of conventional batteries.  It lasts longer, is easier to recycle and takes less energy to manufacture.  It can truly rival the battery as an alternative storage unit.
10.  LN2 is abundant. N2 makes up 78% of atmosphere.
N2 is effectively a waste gas that is created when distilling air into O2 and H2.  It is readily available in every city in the U.S. This makes it easy for customers to get.

No comments:

Post a Comment