In our rewrite about the Company, we decided to make a number of changes or order to provide more clarity about our products and also to try to preempt some of the objections we have heard throughout this entire process.
1) Design & Development - we originally wanted to start with a small scale bench model and possibly even with a working prototype on an electric bicycle. But, as we worked through the design process, we realized that such a model would not be able to be built at a low cost, nor would the efficiency of an electric bicycle be good enough to warrant such a prototype. As such we scrapped than plan and retooled our development process to focus on grant funding in order to have the funding needed to produce a viable prototype.
2) Technical Detail - we were advised that having too much technical detail in our Company section would bog down readers, so we more succinctly summarized the cost of our component parts and moved the technical detail into an appendix.
3) Safety - we have heard many people question the safety of using liquid nitrogen, so we worked to provide information that would give details on this issue. For example, most people thing that liquid nitrogen is dangerous and/or explosive. In fact, it is not at all explosive, and could actually retard a fire in the event of an accident. It is, however, extremely cold, so there are some dangers associated with that, and we discussed our plans to mitigate these dangers.
1.1
Design & Development Plans
Phase I: Development
of an alpha prototype
This will consist of an initial working benchtop prototype
for proof of concept and instrumentation.
This is to bring the technology to the next level for investors and once
demonstrated, reduce development risk.
This early prototype will measure realized performances to determine
electrical output, and to measure any efficiency losses in the system. In particular, the efficiencies of the
components and system as a whole. The
components of the system are standard engineering components (“off the shelf”),
however, the efficiencies of each are empirical. This work will be conducted in
borrowed workspaces.
The estimated time needed for development of this alpha
prototype is approximately three months (500 hours) and will cost approximately
$100,000. We may be reliant on SBIR or
other types of grant funding, so commencement of this work will be somewhat
dependent on how long it takes to obtain this funding. Estimated 3-6 months to obtain funding before
work can commence, unless we are able to obtain equity investment first.
Phase II: Conversion
of fundamental prototype into a demo
This stage will see a beta prototype built to be integrated
into a passenger vehicle, tentatively, a Toyota Prius. Using an existing Toyota
Prius or similar passenger vehicle, parts will be sourced and sized in order to
equip the vehicle with a supplemental liquid nitrogen electrical power
system. Work will be conducted in a
leased garage facility.
Extensive vehicle testing will be conducted to provide data
on fuel efficiency, mileage, range, and emissions. Estimated time to source,
build, and test the beta prototype will be approximately six months (1000 hours)
and estimated costs are $250,000.
Phase III: Development
of a market ready product
The beta prototype will be scaled up to a larger motor
vehicle such as a tractor trailer, bus, or similar large vehicle. This prototype will be built and parts
sourced with larger volumes and redundant suppliers in order to facilitate a
full market entry. A larger/additional garage space will be required in
addition to a production facility. Estimated
time required is six months (2000 hours) and the estimated cost is $750,000 for
initial testing, certification, and first product run. Estimated total
development time is thirteen months (3700 man hours), plus time required to
apply for and obtain grant funding, which for SBIR Phase I & II may require
an additional twelve months or more.
The 3700 man hours will be divided amongst several employees, such that
total development time will likely be 12-18 months.
The parts to create the end product are readily available in
the open market “off the shelf”, with only final assembly and moderate
modification required at the Company facility. For detailed descriptions on the parts, please
see the technical detail in the appendix section. Costs for the core components include:
n Heat exchanger - $400 consumer, $800
industrial
n Low pressure turbine + generator - $2,000
consumer, $4,000 industrial
n Dewar (insulated storage tank) - $1,800 consumer (20 gallon), $3,600 (40
gallon).
n Electrical components - $2,000
consumer, $4000, industrial
So the initial total cost to Cryogenic Power for the
components totals $6,200 for a passenger vehicle, and about double that for
larger vehicles, such as trucks and buses.
It should be noted that these costs are based on existing U.S.
suppliers, and that through redesign, further sourcing, and volume ordering,
that these costs will be driven down significantly over time.
1.2
Social Impact
Cryogenic Power will be dedicated to the causes of preserving
clean air, improving energy efficiency, and continuing to develop renewable
energy ideas that will benefit the economy and mankind. The Company will measure impact on the
reduction of fossil fuel use, the corresponding reduction of carbon emissions,
and transportation cost savings to end users (both commercial and
private). These quantifiable measures
will be a part of the Company’s “Balanced Scorecord”, which will measure
results both in terms of financial performance and societal good as well.
1.3
Safety of Liquid Nitrogen
Liquid Nitrogen is a cryogenic fluid, meaning it is
extremely cold. It is not, however,
flammable nor is it explosive. In fact,
it can act as a fire retardant in the event of an accident. There are several potential dangers in
dealing with liquid nitrogen, as there are with every type of fuel used for
propulsion. One is the pressure created
as it expands (700X) from a liquid form to a gaseous form. So storage tanks need to have a pressure
relief valve in order to ensure that the pressure inside the storage tank
remains within its structural limits.
Engineering of the tank can mitigate these risks. Second is direct physical exposure to liquid
nitrogen. It can cause burns to skin after four or five seconds of exposure,
but this risk can also be offset by requiring locking nozzles on the fuel
tank. Finally, asphyxiation can be a
danger, if LN2 is vented into an enclosed space. An oxygen sensor can be used to mitigate this
risk.
1.4
Product / Service Mix
This product / service mix outlines the proposed offering
for CPI. Ostensibly, it being with either licensing the product by the
Original Equipment Manufacturer (OEM) or buying it in as an aftermarket unit.
For example, in the passenger car market, Toyota could
license CPI’s technology and put it in a Prius. Similarly, a retail
customer could purchase it and have it installed in the CPI shop or at a
licensed installer. In a Prius, this would increase the mileage 2.6 times its
OEM mileage, so if it got 50 MPG, it would now get 130 MPG.
In the bus market, the Company would likely do more
aftermarket installations. Hybrid buses, which would be range bound by
refueling locations would return to a central refueling station, where they
would take on more fuel and LN2. This would obviate the need for the
creation of additional refueling stations.
Most of the locomotives are diesel electric and they can
easily be adopted to this new technology. It requires the separate
attachment of a rail car that has both the LN2 and also a turbine/power system.
Ancillary services for the company would include
installation of the unit by CPI mechanics, fixing the unit when it goes down,
and replacing parts on an occasional basis.
|
Service
|
Passenger Vehicle Customer 30%
|
Bus / Truck Customer
50%
|
Train Customer
20%
|
|
Sale of Unit
|
Aftermarket Unit for Hybrid vehicle
|
Aftermarket Unit for Hybrid vehicle
|
Aftermarket Unit for Diesel Electric Vehicle
|
|
Installation of Unit
|
Adapting / customizing customer unit to a CPI
standard unit for a specific customer
|
Adapting / customizing customer unit to a CPI
standard unit for a specific customer
|
Adapting / customizing customer unit to a CPI
standard unit for a specific customer
|
|
Warranty
|
Repair / replace components
|
Repair / replace components
|
Repair / replace components
|
|
Licensing
|
For OEM car makers
|
For OEM car makers
|
For OEM car makers
|
1.5 Features
vs. Benefits
|
Feature
|
Benefit
|
|
1. LN2 is environmentally
friendly
|
Vehicle manufacturers are increasingly having to meet
stricter emissions standards. For example, a train gets .14 miles per gallon.
This technology saves 263,736 gallons of diesel every year for each train.
This results in 5,902,418 pounds of CO2 being dumped into the
atmosphere every year.
|
|
2. Saves money on fuel
|
Using the train example above the operational cost savings
in fuel for each train is $243,297 per year.
|
|
3. Quickly refueled
|
The vehicle can be filled almost as fast as with
conventional fuel. For example, a Tesla takes ½ hour to get a
charge lasting 100 miles. Who has time for that when you are on the road??
|
|
4. Long lasting equipment
|
Turbines last about 25 years, the Dewar (tank) will last
at least 10 years. A Prius battery warranty lasts 150,000
miles. This means the ROI on the complete unit (over 30 years for
ships and locomotives, will be long lasting.
|
|
5. Off the shelf parts
|
Many of the parts can be purchased of the shelf making it
easy to assemble, scale up or down depending on the car. This
reduces the cost of the unit.
|
|
6. Can be incorporated into
any exhaust system
|
This system is incorporated and utilizes the exhaust
system of any kind of vehicle. This means OEMs can design it into any vehicle
system.
|
|
7. Liquid Nitrogen is not
combustible
|
In case of vehicle collision, it will not
ignite. In fact, it can help put out a fire. It doesn’t
need hazmat cleanup, it can vent directly into the atmosphere. This increases
the safety of the system.
|
|
8. LN2 can be used for other
operations
|
You could conceivably plug the system into your house or
other application when traditional power is not available. In
refrigerated trucks, it could be a substitute for a cooling system.
|
|
9. LN2 Dewar has same storage
capacity of lithium battery
|
This means that it can rival the capabilities of
conventional batteries. It lasts longer, is easier to recycle and
takes less energy to manufacture. It can truly rival the battery
as an alternative storage unit.
|
|
10. LN2 is abundant. N2 makes up 78% of
atmosphere.
|
N2 is effectively a waste gas that is created when
distilling air into O2 and H2. It is readily available in every
city in the U.S. This makes it easy for customers to get.
|
No comments:
Post a Comment